Audex Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting of T112
Annular Plate Replacement &
Repair Work @ OTS |
Oct-10 |
Nov-10 |
Vacuum Blast Concrete Floor
in Compressor Building @
Hermes - Air Liquid |
Oct-10 |
Nov-10 |
Blasting & Painting for Tuas
Basin Pro. For 15 External
Tanks & 2 Internal Tanks |
Sep-10 |
Nov-10 |
Blasting & Painting of T1116
Annular Plate Replacement &
Repair Work @ OTS |
Jun-10 |
Aug-10 |
Blasting & Painting of T1031
Annular Plate Replacement &
Repair Work @ OTS |
May-10 |
Jul-10 |
Blasting & Painting of T 122
Annular Plate Replacement &
Repair Work @ OTS |
May-10 |
Jul-10 |
Blasting & Fitting Of Pipes
& Fitting (Phase 2 SOXAL
LINE) |
Apr-10 |
Sep-10 |
Blasting & Painting of T023
Annular Plate Replacement &
Repair Work @ OTS |
Apr-10 |
Apr-10 |
Blasting & Painting of T1011
Annular Plate Replacement &
Repair Work @ OTS |
Apr-10 |
May-10 |
Blasting & Painting of T1021
Annular Plate Replacement &
Repair Work @ OTS |
Apr-10 |
May-10 |
Blasting & Painting of Pipe
& Fittings MTO & Painting
System (OTS BENZENE LINE) |
Mar-10 |
Mar-10 |
Site Blasting & Painting
Anchor Chair @Ocean Tanker |
Mar-10 |
Apr-10 |
Internal Blasting (Hermes
Phase 1A) |
Feb-10 |
Mar-10 |
Blasting & Painting of T1112
Annular Plate Replacement &
Repair Work @ OTS |
Jan-10 |
Mar-10 |
Blasting & Painting of T1113
Annular Plate Replacement &
Repair Work @ OTS |
Jan-10 |
Feb-10 |
Blasting & Painting of WK SP
Girder Beam |
Nov-09 |
Nov-09 |
Blasting & Painting
Firewater Pipe forTuas Power
Station |
Oct-09 |
Nov-09 |
Blasting & Painting of T1111
variation order & additional
work |
Sep-09 |
Sep-09 |
Air Liquid Pipe, Pipe
Support & Pipe Internal
Blasting & Painting Work |
Aug-09 |
Jul-10 |
Blasting
& Painting of 123
Annular Plate |
Jul-09 |
Aug-09 |
Doom Roof Tank V85(dia. 4.7m
x Ht 6.8m) Internal Blasting
& Painting Work |
May-09 |
May-09 |
4 set of Wind Girder
Material Blast & Prime |
May-09 |
Jul-09 |
Tanjung Priok Project
External & Internal Blasting
for 3 units Container |
Apr-09 |
Aug-09 |
Blasting & Painting of
Diesel Tank(4 units) |
Feb-09 |
Mar-09 |
Blasting & Painting of 8"
PL1239 @ oiltanking Pump
Station 1 |
Jan-09 |
Jan-09 |
Blasting & Painting of T1111
Annular Plate & New Annular
Plate |
Jan-09 |
Apr-09 |
Bladder Tank External &
internal Blasting Painting |
Jan-09 |
Jul-09 |
C6602 Column Blasting &
Painting Work |
Jun-08 |
Jul-08 |
Dome Roof Tank External
Blasting & Painting Work |
Jun-08 |
May-09 |
Blasting and painting at
Tank F13/F14 at Changi CAFHI |
Sep-04 |
Feb-05 |
|
HLE Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T402
|
Sep-07 |
Oct-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T404 |
Sep-07 |
Sep-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T302 |
Aug-07 |
Sep-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T304 |
Aug-07 |
Aug-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T1106 |
Jul-07 |
Jul-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T306 |
Jul-07 |
Aug-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T1102 |
Jun-07 |
Jun-07 |
Blasting & painting work at
Universal Terminal, Jurong
Island Tank No. T1104 |
Jun-07 |
Jul-07 |
Blasting & painting work at
Horizon Tank No. T-408 (Punjlloyd). |
Apr-07 |
May-07 |
Blasting & painting work at
Horizon Tank No. T-409 (Punjlloyd). |
Apr-07 |
Jun-07 |
Blasting & painting work at
Horizon Tank No. T-406 (Punjlloyd). |
Mar-07 |
May-07 |
Blasting & painting work at
Horizon Tank No. T-407 (Punjlloyd). |
Mar-07 |
May-07 |
Blasting & painting work at
Horizon Tank No. T-404 (Punjlloyd). |
Feb-07 |
May-07 |
Blasting & painting work at
Horizon Tank No. T-405 (Punjlloyd). |
Feb-07 |
May-07 |
Blasting & painting work at
Horizon Tank No. T-403 (Punjlloyd). |
Oct-06 |
Nov-06 |
Blasting & painting work at
Horizon Tank No. T-109 (Punjlloyd). |
Aug-06 |
Sep-06 |
Blasting & painting work at
Horizon Tank No. T-111 (Punjlloyd). |
Aug-06 |
Sep-06 |
Blasting & painting work at
Horizon Tank No. T-107 (Punjlloyd). |
Jul-06 |
Sep-06 |
Blasting & painting work at
Horizon Tank No. T-209 (Punjlloyd). |
Jul-06 |
Aug-06 |
Blasting & painting work at
Horizon Tank No. T-203 (Punjlloyd). |
Jun-06 |
Jul-06 |
Blasting & painting work at
Horizon Tank No. T-204 (Punjlloyd). |
May-06 |
Jul-06 |
Blasting & painting work at
Horizon Tank No. T-304
(Punjlloyd). |
Apr-06 |
Jul-06 |
Blasting & painting work at
Horizon Tank No. T-306
(Punjlloyd). |
Mar-06 |
Jun-06 |
Blasting & painting work at
Horizon Tank No. T-301
(Punjlloyd). |
Feb-06 |
Jun-06 |
Blasting & painting work at
Horizon Tank No. T-104
(Punjlloyd). |
Jan-06 |
Oct-06 |
Blasting & application of
one coat of primer work at
SRC Tank No. 1112TD (Pulau
Merlimau). |
Nov-05 |
Jan-06 |
Blasting & application of
one coat of primer work at
SRC Tank No. 1170TA (Pulau
Merlimau). |
Aug-05 |
Oct-05 |
Blasting & painting work at
SRC Tank No. 1101TA (Pulau
Merlimau). |
Apr-05 |
Jun-05 |
Blasting & painting work at
SRC Tank No. 1116TA (Pulau
Merlimau). |
Mar-05 |
May-05 |
Vacuum blasting and painting
work at Shell Pulau Bukom
Tank No. V2012 |
Feb-05 |
May-05 |
Blasting & painting work at
SRC Tank No. 1116TE (Pulau
Merlimau). |
Dec-04 |
Feb-05 |
Blasting & painting work at
ExxonMobil Tank No. PF22
(Pulau Pesek) |
Dec-04 |
Mar-05 |
Vacuum blasting and painting
work at Shell Pulau Bukom
Tank No. 81 |
Oct-04 |
May-05 |
Vacuum blasting and painting
work at Shell Pulau Bukom
Tank No. V2010 |
Oct-04 |
Mar-05 |
Blasting & painting work at
SRC Tank No. 1150TA (Pulau
Merlimau). |
Oct-04 |
Nov-04 |
Blasting & painting work at
SRC Tank No. 1112TH (Pulau
Merlimau). |
Oct-04 |
Dec-04 |
Blasting & painting work at
SRC Tank No. 1104TB (Pulau
Merlimau). |
May-04 |
Jun-04 |
Blasting & painting work at
SRC Tank No. 1170TC (Pulau
Merlimau). |
May-04 |
Jul-04 |
Blasting & painting work at
ExxonMobil Tank No. F14
(Pioneer Road) |
Apr-04 |
Jun-04 |
Blasting & painting work at
ExxonMobil Tank No. PF7
(Pulau Pesek) |
Apr-04 |
Jun-04 |
Vacuum blasting and painting
work at Shell Pulau Bukom
Tank No. 517 & 518. |
Apr-04 |
May-04 |
Blasting & painting work at
ExxonMobil Tank No. PF2
(Pulau Pesek). |
Feb-04 |
Apr-04 |
Vacuum blasting and painting
work at Shell Pulau Bukom
Tank No. 80. |
Jan-04 |
May-04 |
Blasting & painting work at
SRC Tank No. 1112TF (Pulau
Merlimau). |
Dec-03 |
Apr-04 |
|
Rotary - Other Sites
|
|
|
Project Name
|
Start |
End
|
SPC Roof Replacement
Blasting & Painting Works @
Site |
Jan-11 |
In Progress |
Blasting & Painting for
Piping Line, Fitting and
Steel Structure @ Chevron
Neptune |
Sep-09 |
Feb-10 |
Shop Blasting & Painting
Works |
Jul-09 |
Aug-09 |
Blasting & Painting for
Piping, Valves and Steel
Structure & Plate @ Chevron
Neptune |
Dec-08 |
Oct-09 |
Pipes Blasting & Painting
Work @ Power Seraya |
Nov-08 |
Mar-09 |
Blasting & Painting for SPC
Replacement Of Tank Roof T
01 & T 06 Pulau Sebarok. |
Sep-08 |
Mar-09 |
Bundwall Painting( L5 x
H4.5m x W250mm) |
Sep-08 |
Sep-08 |
Bunker Metering Skid Blast,
Paint & Putty |
Aug-08 |
Sep-08 |
Blasting and painting for
Chevron Penjuru Diesel Tank
& Accessories |
Jul-08 |
Oct-08 |
Blasting & painting work at
SPC Tank No. 03 at Pulau
Sebarok. |
Sep-07 |
Dec-07 |
Blasting & painting work of
Piping & Structure - EPC for
Berth 3 Conversion Project @
Power Seraya |
Jun-07 |
Mar-08 |
Blasting & painting work at
SPC Tank No. 02 at Pulau
Sebarok. |
Sep-05 |
Jan-06 |
Blasting, Painting & Paint
Touch-up for 2 units of
Micro Filter & 2 units of
Filter Water
Separator at OTS Site @ Jet
Fuel Storage Facilities at
Oil Tanking. |
Feb-05 |
Jun-05 |
Blasting and Painting for
Tank 8505 / 8506 internal 1m
height shell course & tank
bottom
and 2 length of tank
internal 8" pipe @ Jet Fuel
Storage Facilities at Oil
Tanking. |
Feb-05 |
Jun-05 |
Blasting and Painting to
touch-up at shop and OTS
site for Pipelines, Pipe
Spools, Valves
and Fittings @ Jet Fuel
Storage Facilities at Oil
Tanking. |
Feb-05 |
Jun-05 |
Blasting, Painting & Paint
Touch-up at Shop & OTS Site
for 1 unit of Recovery Tank
@ Jet Fuel Storage
Facilities at Oil Tanking. |
Feb-05 |
Jun-05 |
Blasting, Painting & Paint
Touch-up for 4 units of
Mushroom Vent at OTS site
@ Jet Fuel Storage
Facilities at Oil Tanking. |
Feb-05 |
Jun-05 |
Blasting & Painting on Tank
161 |
Jan-05 |
Apr-05 |
Blasting & Painting on Tank
903 |
Jan-05 |
Jul-05 |
Blasting & Painting on Tank
123. |
Aug-04 |
Dec-04 |
Blasting & Painting on Tank
141. |
Aug-04 |
Feb-05 |
Blasting & Painting on Tank
232 & 233 |
Aug-04 |
Nov-04 |
Blasting & Painting on Tank
205. |
Jul-04 |
Jul-04 |
Blasting & Painting on Tank
204. |
Jul-04 |
Aug-04 |
Shop / Site Blasting &
Painting @ PGS T-5. |
Jun-04 |
Jun-04 |
Blasting & Painting on Tank
133. |
Apr-04 |
Jun-04 |
Blasting & Painting on Tank
145. |
Mar-04 |
May-04 |
|
UTOC Engineering Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting Works
For Shell 3A Phase 2 Project |
Jan-11 |
Feb-11 |
Soxal Vessel Site Blasting &
Painting Works |
Dec-10 |
Dec-10 |
Shop Blasting & Painting -
Tate & Lyle Misc Maint Work |
Nov-10 |
Nov-10 |
Shell Woodlands Pipe
Blasting & Painting Work
Shop & Site |
Nov-10 |
Jan-11 |
Blasting & Painting Work,
Providing Manpower and
Material @ Soxal J9 Project |
Nov-10 |
Jan-11 |
Site Blasting Painting Works
For UTOC-MES/SME Project |
Oct-10 |
Dec-10 |
CPTC Exchangers Painting &
Touch Up Work |
Oct-10 |
Oct-10 |
Tate & Lyle Shop Blasting &
Painting |
Aug-10 |
Aug-10 |
Shaw Column Base Plate
Blasting & Painting Work |
Aug-10 |
In
Progress |
ExxonMobil - SPU Prroject
(Manpower Supply) |
Aug-10 |
In
Progress |
Painting Work Shop, Blast &
3 Coat - Steel Structures
(MP06) |
Jul-10 |
Aug-10 |
Blasting & Painting Channels
- Supply Labour Material &
Eqpt.
(SOXAL J9) |
Jul-10 |
Aug-10 |
Pipe Blasting & Painting
Work(Nitrogen, Drain Sump,
Firewater & Pipe For Natura
Fuel Project) |
Jun-10 |
Aug-10 |
Blasting & Painting Works @
Blasting Shop
(MP06) |
Apr-10 |
Apr-10 |
Site Blasting Painting Works
For SPT-Cracking Furnance
Project |
Mar-10 |
Jan-11 |
Blasting & Painting Works @
Shop
for Sir Fabrication
Pipe Support |
Jan-10 |
Apr-10 |
Blasting & Painting For
Blind Flanges |
Jan-10 |
Jan-10 |
Seal Pot Piping Blasting &
Painting |
Sep-09 |
Oct-09 |
Blasting & Painting Works @
Shop
for SPT Project |
Jul-09 |
Jun-10 |
Vacuum Blast Concrete Floor |
Feb-09 |
Feb-09 |
Shop & Field Blasting &
Painting Work for MSD |
Mar-08 |
Jul-08 |
Shop / Field
Blasting & Painting
of Pipe & Fitting -
Singapore AO Plant MC3 |
Feb-08 |
Aug-08 |
Field Blasting & Painting
Work at Singapore AO Plant -
MC1 & MC2 |
Aug-07 |
Mar-08 |
Blasting & Painting Work at
GSK |
Jun-07 |
Jan-08 |
Shop Blasting & Painting of
Pipe & Fitting - Singapore
AO Plant MC1 & MC2 |
Mar-07 |
Feb-08 |
|
Oiltanking Singapore Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting With 1
Coat Interior Coat
(TANK 324 & 321) |
Nov-10 |
Jan-11 |
Blasting & Painting on Side
Shell fr Existing Coated
Area Extend to 1.7 for T1011 |
May-10 |
May-10 |
T1116 Roof Underside
Blasting & Painting Works |
May-10 |
Jul-10 |
Blasting & Painting Ponton
Side Outer Rim for T112 |
Apr-10 |
May-10 |
Blasting & Painting Floating
Roof Entire Side & Underside
for T122 |
Feb-10 |
Apr-10 |
Blasting & Painting on Side
Shell fr Existing Coated
Area |
Jan-10 |
Feb-10 |
Blasting & Painting Floating
Roof |
Aug-09 |
Sep-09 |
Spot Blasting & touch up
Painting @ T121 Floating
Roof Deck |
Jun-09 |
Jun-09 |
Blasting & Painting Floating
Roof Entire Deck Underside
for T1113 |
Jun-09 |
Jul-09 |
To spot blast all corroded
surface to SA 2.5std for
tank 123 roof top side + T123
internal blasting & painting |
May-09 |
Jun-09 |
Perform Full Blasting on
Lifted Annular Plate for
Inspection |
May-09 |
Jun-09 |
|
HSL Constructor Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Replacement of Bukom Beacon
for MPA Blasting & Painting
Works |
May-09 |
May-09 |
Replacement of Bukom Beacon
for MPA Blasting & Painting
Works |
May-09 |
May-09 |
Site Blasting & Painting
Material @ Oiltanking |
Mar-08 |
Aug-08 |
Blasting & Painting on Pipe
Header for Jetty 5(PL 1001
Repad Plate @ Oiltanking) |
Nov-07 |
Nov-07 |
Blasting & Painting
Structures & Pipe @
Oiltanking Yard |
Nov-07 |
Dec-07 |
Tank 332 Bottom Plate Top
Side Spot Blasting |
Dec-05 |
Dec-05 |
|
PEC LTD
|
|
|
Project Name
|
Start |
End
|
Blast / Paint Pipe Spools
for SHELL ECC |
Dec-08 |
Mar-09 |
P.T. Istana Karang Laut
Fabricated Pipes Blasting &
Painting |
Nov-07 |
Dec-07 |
Blasting & Painting of Pipe
Truss Support @ Pulau Sakra |
Oct-07 |
Oct-07 |
Carboxylated Tankage System
Manual Blasting; Chequered
Plates & Vent Covers |
Aug-07 |
Sep-07 |
Carboxylated Tankage System
Blasting & Painting Work
(SPC Tank 7060 /62 / 64 /66) |
Aug-07 |
Sep-07 |
|
Acolite Construction (S) Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Menicon Factory |
Dec-08 |
Dec-08 |
|
Advance Surface Industries Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Fuji Oil Tank Blasting &
Painting Work At Site |
Oct-10 |
Dec-10 |
Blast & Coat Tank T-105
Internal @ Fuji Oil (S) Pte
Ltd |
Dec-08 |
Jan-09 |
|
Balanced Engineering &
Constn Pte. Ltd.
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting of SS &
CS Flue Cans(BRM & ECC
Project) |
Sep-08 |
Mar-09 |
|
Bluewaves Engineering &
General Services Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Auto Blasting for Cargo
Hold Area Ropax Passenger
Ferry - Deck 6 @ Singapore
Technologies Marine |
Sep-10 |
Oct-10 |
Auto Blasting for Cargo
Hold Area Ropax Passenger
Ferry @ Singapore
Technologies Marine |
Jul-10 |
Aug-10 |
|
Cattel Engineering Pte Ltd.
|
|
|
Project Name
|
Start |
End
|
Blasting and Painting Works
for Demin Water Tank T2001
at 51, Sakra Avenue, SUT
Sakra |
Jan-06 |
Feb-06 |
|
Corrosion Proof Construction
(Asia) Pte Ltd.
|
|
|
Project Name
|
Start |
End
|
Concrete Floor Blasting to
IMFS-Fab Project |
Feb-08 |
Mar-08 |
|
Delimax Ind. Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Flat Bar Blasting & Painting |
Jul-09 |
Aug-09 |
|
Flowcrete Singapore Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Wetblasting of Concrete
Walls & Concrete Floor
Blasting @ Sentosa |
Feb-11 |
In
Progress |
|
Hiap Seng Engineering Pte
Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting Of SRC
72" Flue Gas Pipeline |
Oct-10 |
Dec-10 |
|
I-Build Industries Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Floor Blasting @ No: 19
Loyang Way |
Jul-09 |
Jul-09 |
|
Industrial Contracts
Marketing (2001) Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Seagate W3 Factory |
Jun-09 |
Jun-09 |
Seagate Factory |
Mar-09 |
Jul-09 |
3M Factory @ Tuas Link 4 /
Tuas West Rd |
Sep-07 |
Oct-07 |
|
INVISTA (Singapore)Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Jetty Sheet Pile Wall
Blasting & Painting |
Jan-08 |
Mar-08 |
|
John Crane Singapore Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting of T1114
Annular Plate Replacement &
Repair Work |
Jan-11 |
Feb-11 |
|
Jurong Engineering Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting Works
(Shop & Field) for Shell ECC
Project (Process Piping 1) @
Pulau Ular |
Oct-07 |
Dec-09 |
|
Kim Hup Chor Construction
Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Concrete Blast @ 313
Somerset |
Aug-09 |
Sep-09 |
|
Kuriyama-Ohji (Singapore)
Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Storage Tank Internal
Blasting and Painting at
Tuas Power Station. |
Sep-04 |
Dec-04 |
|
Oiltanking Odfjell Terminal
Singapore Pte. Ltd.
|
|
|
Project Name
|
Start |
End
|
Provide Temporary Platform &
Guard Rail @ Seraya Jetty 2
for 1 month |
Mar-10 |
Mar-10 |
Jetty 10 Draw Yellow Lines
Buggy Parking Lots Including
Tags & Signage |
Nov-09 |
Nov-09 |
Seraya Front Navigation
Light Mast |
Nov-09 |
Dec-09 |
|
Overseas Technical
Engineering and Construction
Pte Lt
|
|
|
Project Name
|
Start |
End
|
Blast & Paint Cement Lined
Pipes; Fittings; Stairways;
Link Bridges; Nozzles; Tee;
Bolts & Nuts ; misc |
Feb-08 |
May-08 |
Roof Plate; Raw Pipes &
Plate Shop Blasting and
Painting - T1500KL & T2500KL |
Sep-07 |
May-08 |
|
Plant General Services Pte Ltd
|
|
|
Project Name
|
Start |
End
|
GSK PB2 Phase 1 Blasting &
Painting Work |
Jul-10 |
Feb-11 |
LRCCU Bukom Project Shop & Site Blasting,
Painting & Manpower Supply |
Jan-10 |
Oct-10 |
|
Polyxylenol Singapore Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting and painting at D-311
Recovered TL Tank at 20 Sakra
Road, Jurong Island. |
Jun-04 |
Jun-04 |
|
Powell Industries Asia Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Tasnee Skid Blasting & Painting
@ REL Yard |
Jan-07 |
Mar-07 |
Blasting & Painting Work @
Universal Terminal PCR Modules |
Jan-07 |
Jun-07 |
Shop Blast & Prime 1 coat; Site
Painting of Exterior/Interior
Surface @ Bohai Bay |
Jun-06 |
Sep-06 |
|
Resorts World At Sentosa Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Manpower Supply For BSG Red Line
Painting Work @ Universal
Studios Singapore |
Nov-10 |
Dec-10 |
|
S E A Hydropower Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Hydrogen Cylinder Blast & Paint |
Aug-08 |
Jan-09 |
|
ShopGlobal Pte Ltd
|
|
|
Project Name
|
Start |
End
|
SPT-SP 272 Blasting & Painting
Works |
Feb-11 |
Feb-11 |
Blasting & Painting for Pipe
Supports |
Jul-10 |
Aug-10 |
Fabricated Galvanized Pipe
Spools External Painting Work |
Apr-10 |
May-10 |
|
Tankstore - Pulau Busing
|
|
|
Project Name
|
Start |
End
|
Vacuum blasting and painting
work on Tank 422 Bottom Only
(Dia. 36m) |
Jul-06 |
Aug-06 |
|
Toh Teck Seng Engineering &
Construction Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Blasting & Painting of T1114
Annular Plate Replacement &
Repair Work |
Nov-10 |
Nov-10 |
|
Zhen Hua (S) Engineering Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Sand Blasting and Painting Works
for Spirally Steel at P. Busing |
Apr-06 |
May-06 |
|