Audex Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Painting of Fire Drencher
Line for Tank 5,6,7,8,9 & 10
(Old Tank) @ Ocean Tanker
Project |
Nov-10 |
Jan-11 |
Fire Water Tank Ext.
Cleaning Work, Blasting of
12" Elbow & 10" 90º Elbow |
Oct-10 |
Oct-10 |
Painting of 907 Valves |
Oct-10 |
Nov-10 |
Painting of Cooling Tower
AEA 24 Add Material R5102-1
& R5102-2, Compressor
Building & NOG Pipe Rack Add
Platform |
Sep-10 |
Nov-10 |
Painting Work for Turbine &
NOG 1(area 04) |
Aug-10 |
Nov-10 |
TANJUNG
BIN-Painting
Works for ATB Terminal &
Jetty Topside Facilities
Project. (Piping) |
Aug-10 |
In
Progress |
Valves Painting For 88 pcs |
Jul-10 |
Jul-10 |
Painting NOG2 (Pipe Rack) R1 |
Jul-10 |
Nov-10 |
PSA Pipe Painting Work |
May-10 |
Jun-10 |
Tanjung Bin
Project (Plates & Raw
Materials Shop Blasting and
Panting Work) |
May-10 |
In
Progress |
Painting of Corrugated
Aluminium Sheet for Ocean
Tanker |
Mar-10 |
Apr-10 |
Hermes Piping Repair
Painting Work |
Mar-10 |
Oct-10 |
Painting Works for 5 Sets of
Hydrant Headers |
Mar-10 |
Mar-10 |
Tate & Lyle Piping Painting
Work |
Mar-10 |
Apr-10 |
Supply of Manpower & Paint
Material @ Ocean Tanker
Project |
Feb-10 |
Feb-10 |
Painting Hermes Flare |
Feb-10 |
Mar-10 |
Painting on Galvanised 214
pcs Structures @ Tuas Power
Scop |
Feb-10 |
Apr-10 |
Painting of UBA Flare System |
Feb-10 |
Nov-10 |
PSA Skid Spool |
Nov-09 |
Nov-09 |
PUB Line @ Tuas Power |
Aug-09 |
Aug-09 |
Fujairah Pipe & Pipe Support
Painting Work |
Aug-09 |
Jan-10 |
B & P of Emergency Vent for
T8601 , T8602 & T8603 |
Jun-09 |
Jun-09 |
Doom Roof V50 Tank for
Painting Logo |
May-09 |
May-09 |
Pig Launcher 2 Sets |
May-09 |
Jun-09 |
Life Buoy |
May-09 |
Jun-09 |
H2 Plant Structural Painting |
May-09 |
Aug-09 |
Painting 1 No of Methyl
Chloride Tank at Akzo Nobel |
Oct-08 |
Oct-08 |
Tate & Lyle Tank Internal &
External Painting Work
(17.2m x Ht 18m) |
Nov-07 |
Mar-08 |
Oiltanking Bunkering
Facilities Painting Work |
Nov-07 |
Oct-08 |
|
Rotary - Other sites
|
|
|
Project Name
|
Start |
End
|
Tank 539 Foam Line Painting |
Feb-10 |
Feb-10 |
Tank 539 Water Drain Valve |
Feb-10 |
Feb-10 |
Tank Numbering For T-8104 |
Feb-10 |
Feb-10 |
Module Touch-up Painting Work |
Feb-10 |
Feb-10 |
Chevron Fire House Concrete Wall |
Jan-10 |
Jan-10 |
Chervon Seagate To Tankfarm 541 |
Jan-10 |
Jan-10 |
Chervon Thiam Joo Manifold & Pump House Area |
Jan-10 |
Jan-10 |
Chervon Tankfarm 521, 522 & 523 Area |
Jan-10 |
Jan-10 |
Chervon Pump House 3 Area |
Jan-10 |
Jan-10 |
Chervon Neptune Prj. Site Additional Painting |
Jan-10 |
Jan-10 |
Chervon DIMO Office |
Jan-10 |
Jan-10 |
Chervon Sub-Station 3 Area Pipeline |
Jan-10 |
Jan-10 |
Chervon Site Road Cap Painting Work |
Jan-10 |
Feb-10 |
New Epoxy Painting @ TTLR |
Dec-09 |
Jan-10 |
Loading & Suction Replacement |
Dec-09 |
Feb-10 |
Cross-Over Platform, Valves & Structure |
Dec-09 |
Jan-10 |
Power Seraya Insulated Values 1/2" to 6" |
Aug-09 |
Aug-09 |
Power Seraya Maintenance Platforms |
Jul-09 |
Aug-09 |
Phase 10 Splash Zone Unpainted Steel Plate
Additional Work |
Apr-09 |
Apr-09 |
Roof Replacement in PHA(142 / 144 / 146 / 148) |
Mar-09 |
Jan-10 |
Chem 5 Pipe bridge Painting Work |
Jan-09 |
Feb-09 |
Additional Material For Chevron Diesel Tank
Project (B & P) |
Nov-08 |
Nov-08 |
Existing Diesel Tank Structural LAGP |
Oct-08 |
Nov-08 |
Chevron Additional Painting Work |
Oct-08 |
Oct-08 |
Tank External & Internal Painting Work @ Power
Seraya |
Oct-08 |
Dec-08 |
Painting Works for Galvanized, Insulated
Pipes, Piping Material & Structure Steels @ Power
Seraya |
Aug-08 |
Sep-08 |
Tank External & Internal and Piping Painting
Work - Phase 10 |
Jun-08 |
Mar-09 |
Shell Module Painting Work |
Mar-08 |
May-08 |
Oiltanking Base Skid Painting Work |
Mar-08 |
Jun-08 |
CIBA Maintenance PV |
Mar-08 |
Mar-08 |
Chevron Oronite Tank Non-Skid Painting Work -
Tank 530 / Tank 531 / Tank 532 |
Feb-08 |
Mar-08 |
Tank External Painting work at Chevron Oronite
on Tank 531 |
Jan-08 |
Feb-08 |
Tank External Painting work at Chevron Oronite
on Tank 530 |
Nov-07 |
Dec-07 |
Tank External Painting work at Chevron Oronite
on Tank 532 |
Jul-07 |
Aug-07 |
Painting & Paint touch-up at OTS for all Pipe
Support/Rack/Guide and Platform Structure
@ Jet Fuel Storage Facilities at Oil Tanking. |
Feb-05 |
Jun-05 |
|
HSL Constructor Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Painting PL 1237 & 1236 @ OTS Jetty Entrance to
Old Battery Ltd |
Feb-08 |
Oct-08 |
Painting on 1 unit Oiltanking Terminal Marine
Loading Arm 404 & Site Blasting & Painting @ OTS |
Oct-07 |
Oct-07 |
Exterior & Interior Painting on Sub-Station 80,
82 & 84 |
Sep-07 |
Sep-07 |
Painting 1 Unit Operator Shelter Interior @ OSCJ |
Sep-07 |
Oct-07 |
Painting of 1 unit MLA 401 Loading Arm @ Tuas
Road Yard |
Aug-07 |
Aug-07 |
OTS Main Building & Retaining Wall Concrete
Painting |
Jul-06 |
Aug-06 |
Consolidated Painting Work on Various Material @
OTS |
Jun-06 |
Jun-06 |
Painting of One Loading Arm MLA 201 |
Jun-06 |
Jul-06 |
Tank 332 @ OTS |
Jan-06 |
Feb-06 |
Tank 332 Roof Platform. Walkway & Handrailing @
OTS |
Dec-05 |
Jan-06 |
Tank 332 @ Oiltanking |
Oct-05 |
Dec-05 |
|
Oiltanking Singapore Limited
|
|
|
Project Name
|
Start |
End
|
Painting & Draw
New
Lot On
New Refurnishing
car park Area
Including
Barrier & Wall
C/W Signage
Painting (PHASE
6) |
Sep-10 |
Oct-10 |
T321 Interior
Bottom Plate &
1M Shell |
Sep-10 |
Nov-10 |
Painting
Programme for 5
years at Jurong
Island |
Sep-09 |
Feb-11 |
T316 Interior
Bottom Plate |
Sep-09 |
Oct-09 |
T312 Interior
Bottom Plate |
Aug-09 |
Sep-09 |
Painting on
Cabin Container
& Draw car park
Lot for Phase 6 |
May-09 |
May-09 |
Painting
Programme for 5
years at Jurong
Island |
Jan-05 |
Dec-10 |
|
Changi Airport Fuel Hydrant Installation Pte. Ltd.
|
|
|
Project Name
|
Start |
End
|
Repair & Painting of CAFHI Jetty Pipe Line |
Dec-10 |
Jan-11 |
Suction Pipe & Tank 13 & 14 Valves Repair Painting Work |
Dec-09 |
Dec-09 |
Additional Work For Suction Line |
Dec-09 |
Jan-10 |
Pressure Line |
Dec-09 |
Jan-10 |
Tank Form 1 Painting Work force Piping & Valve for Tank 1 & 2 |
Jun-09 |
Jul-09 |
|
Fastweld Engineering Construction Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Shell Pandan SPC - TK 07 Interna & External Blasting & Painting Works |
Mar-11 |
In Progress |
Painting Pipelines @ CAFHI Tank farm 3 to 10 |
Feb-08 |
Apr-08 |
Blasting & Painting - Total Petrochemical (Tank 191 / 116 / 113) |
Jan-08 |
Feb-08 |
Painting of Jetty Trestle at Jetty 1 & Jetty 2 |
Jul-07 |
Sep-08 |
Tank Internal Painting work for CAFHI Tank No. 8 |
Jul-05 |
Aug-05 |
|
UTOC Engineering Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Mitsui C3-PJ |
Jan-10 |
Jan-10 |
|
Painting Works for SPT SAR-X & DIB Project |
Feb-09 |
Oct-10 |
|
Foster Wheeler Runway Beams @ Sakra - Jurong Island |
Mar-08 |
Jun-08 |
|
Field Painting Work at SPH Expansion Project at MPS Plant |
Apr-07 |
Aug-07 |
|
Shop and site painting at CRYSTAL - Tate and Lyle At Pulau Sakra. |
Sep-05 |
Mar-06 |
|
Jurong Engineering Ltd
|
|
|
Project Name
|
Start |
End
|
Exxon Mobil SPOX Project ( Stencilling
& Equipment Lettering) |
Dec-10
|
Jan-11
|
Exxon Mobil SPOX Project
(Site Manpower Supply) |
Jul-10 |
Dec-10 |
Exxon Mobil SPOX Project
Shop Work |
Aug-09 |
Sep-10 |
Painting at Seraya Stage 1
Orimulsion Project at Jurong
Island |
Jul-04 |
Feb-05 |
|
Overseas Technical Engineering and Construction Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Vopak Penjuru Tank Roof
Additional Painting Works |
Aug-08 |
Sep-08 |
Galvanized Operating
Platform Painting Work |
Aug-08 |
Oct-08 |
Tank Number Stenciling at
Vopak Penjuru - T1500KL &
T2500KL |
Apr-08 |
Jun-08 |
Site Painting for 2500KL &
1500KL Tank at Vopak Penjuru |
Oct-07 |
Aug-08 |
|
Chevron Singapore Ltd
|
|
|
Project Name
|
Start |
End
|
Tank Roof (501) Non Skid |
May-09 |
May-09 |
Tank Annular Plate Painting
(TK 544) |
May-09 |
May-09 |
Tank Roof (544 / 545 / 547 /
500 / 503 / 504 / 505 / 506
& 507) Non Skid |
May-09 |
Aug-09 |
|
Balanced Engineering & Construction Pte. Ltd
|
|
|
Project Name
|
Start |
End
|
Spray Painting of Membrane for Concrete Tank in Bukom |
Jan-09
|
Feb-09 |
|
Fu Seng Heng Industries Services
|
|
|
Project Name
|
Start |
End
|
Separator Tank |
May-10 |
May-10 |
|
HLE Pte Ltd
|
|
|
Project Name
|
Start |
End
|
High Pressure Water Jet and Painting work for Island Pipeline Gas Cold Box (Jurong Island Singapore) |
Apr-05
|
Apr-05
|
|
Homag Asia Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Ware House Painting Work |
Oct-10
|
Oct-10
|
|
International Paint Singapore Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Fading Interthane 990 @ Tank Logo |
Apr-10
|
May-10 |
Repainting Works To Oil Tanking Phase 6)
|
Aug-09
|
Oct-09 |
|
Oiltanking Odfjell Terminal Singapore Pte. Ltd.
|
|
|
Project Name
|
Start |
End
|
12 Unit C. Steel Dome Roof @ TF 82 Including Fitting |
Jan-10 |
Mar-10 |
Blasting & Painting on Sump Tank Support @ Seraya Jetty 2
|
Dec-09 |
Jan-10 |
|
PEC LTD
|
|
|
Project Name
|
Start |
End
|
IPG Water Ballast Tank Painting
Works |
Apr-09 |
Apr-09 |
IPG 6" Pipeline Painting Works |
Apr-09 |
Apr-09 |
IPG Cold Box Painting Work |
Jun-07 |
Jul-07 |
|
Shao Fook Engineering Pte Ltd
|
|
|
Project Name
|
Start |
End
|
T 1223, 1212 & 1213 Sprinkler & Foam Lines
|
Jul-10 |
Sep-10 |
To Provide & Install 2 units Gondola System @ T1223 & T1213 at OTS
|
Jan-10 |
Jan-10 |
|
Powell Industries Asia Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Yanbu Rib External Painting Work |
Dec-06
|
Feb-07
|
|
Swire Pacific Offshore Operations (Pte) Ltd
|
|
|
Project Name
|
Start |
End
|
Painting of 3 Unit of Ariel Compressors A,B, & C @ Loyang |
Mar-08
|
Apr-08
|
|
Vopak Terminals Singapore Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Maintenance and Repair of Jetty Trestle Pipelines Paint Works at VTS-Sarka Terminal Singapore |
May-06
|
Sep-06
|
|
Weldtools Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Fuji Oil Tank 315 & 507 External Painting Work |
Dec-08
|
Jan-09
|
|
Y S Supplies Pte Ltd
|
|
|
Project Name
|
Start |
End
|
Fitting, Raw Pipe Painting |
Aug-08
|
Dec-08
|
|